Raymond started its drywall business in 1968. With more than 50 years of experience, Raymond has the people, experience, systems and resources to complete jobs (big and small) and deliver quality that consistently exceeds our clients’ expectations. Most notably, on the largest student housing project in the US, Raymond installed 7 million square feet (sf) of drywall. On another project, Raymond completed one wall that alone had more than 1.2 million square feet (sf) of drywall.
The Raymond Group is an owner of a drywall milling machine in each of our office locations. This revolutionary manufacturing system makes creating intricate shapes and assemblies from drywall much more affordable and cost effective. Originally created for the need of architecturally demanding projects, today The Raymond Group uses these strategically located machines to help provide a safer, timelier, cost effective, less wasteful product for each of our projects where repetition or high design is required.